Project Scheduler IV

 
Location: Jackson, Michigan
Posted On: 10/12/2017
Job Code: Project Scheduler IV
Print
 
Job Description
 
Job Title: Project Scheduler IV
Location:- Jackson MI
Duration:- 6 months with extensions

Duties:-
The Project Scheduler will utilize Primavera P6 to develop and maintain a resource loaded schedule integrating development, engineering and execution of between 60 and 90 Gas Metering and Regulation Projects.
The Project Scheduler will also analyze past and present data to generate reports and presentations and to create more effective schedules.

Skills:-
• Must have 5+ years of experience in any of the following industries: architecture/engineering, energy/utility, or general contracting/construction
• Natural Gas Pipeline/Regulation project experience preferred
• Primavera (Oracle) P6 experience
• Presentation skills required in meetings and in training
• Ability to read blueprints and technical documents preferred.
• Experience in architectural, engineering and construction scheduling is beneficial, and knowledge of management resource planning (MRP) is expected.
Category:IT  code:new
 
 
Job Requirements
 
 
Engineering, Architecture, Oracle, Management, Training, Natural
 

Not Ready to Apply?
Contact Details
 
Recruiter
Raunak Jain
 
Phone
 
E-mail Address
 
LinkedIn